Send Message
Tel:
Jinzhou City Shitan Machinery Equipment  CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

Home ProductsWater Well Drilling Rig Machine

Rotary 100m ISO Water Well Drilling Rig Machine

Rotary 100m ISO Water Well Drilling Rig Machine

  • Rotary 100m ISO Water Well Drilling Rig Machine
  • Rotary 100m ISO Water Well Drilling Rig Machine
Rotary 100m ISO Water Well Drilling Rig Machine
Product Details:
Place of Origin: China
Brand Name: ST
Certification: ISO
Model Number: ST-100
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Packaging Details: 1, plastic bags inside,wooden boxes outside,or as customers'request 2, seaworthy packing
Contact Now
Detailed Product Description
Drilling Diameter(mm): 75,100 Drilling Depth (m): 100
Drill Pipe Diameter (mm): 42 Drilling Angle(°): 90-75
Equipment Size(L * B * H): 1640 * 1030 * 1440 (mm) Rig Weight (except Engine): 500
High Light:

ISO Water Well Drilling Rig Machine

,

100m Water Well Drilling Rig Machine

,

Rotary trailer mounted drill rig

Rotary Trailer Mounted 300m Depth 37KW Power Small Water Well Drilling Rig

 

 

Water Well Drilling Rigparameter

 

Unity machine parameter
Drilling depth 600m
Max open hole caliber 300mm
End hole caliber 75mm
Drilling Rod diameter 60mm
Drilling angle 90°~65°
Spindle
spindle speed Forward 30-1050r/min
Reverse 29-137r/min
Spindle stroke 560mm
Spindle inner diameter 96mm
Lifting capacity 60KN
Main winch
Max.Single line lifting capacity 40KN
Max.Single line lifting speed 0-45m/min
Wirerope caliber 14mm
Wirerope length 30m
Reel diameter 300mm
Hug folldgate belt width 90mm
Minor winch
Reel diameter 140mm
Wirerope caliber 6mm
Wirerope length 450m
Mud pump
Type Horizontal Triplex BW-250 mud pump
Displacement 250 L/min
Work pressure 7 Mpa
Water inlet pipe diameter 75 mm
Water outlet pipe diameter 50 mm
Gear Oil pump
Duplex gear oil pump CBF-F63/25
Front Displacement, pressure 63 L/min 20Mpa
Behind Displacement, pressure 25 L/min 20Mpa
Power
Diesel engine 37KW
   
Wheel undercarriage
Chassis loading 3T
Chassis length 2.6m
Chassis with 2m
Max high crawler 0.6m

 

Drilling with drilling machine not only saves manpower, but also improves efficiency. It is convenient, fast, time-saving and labor-saving. How does it work? Here is the drilling process of drilling machine


1. According to the water yield requirements of the well, the depth and diameter of the well are designed, and the drilling machine and corresponding auxiliary equipment are selected according to the formation conditions.
2. Before drilling, machine platform leveling, equipment layout, equipment storage, tower erection and drilling rig placement shall be done well.
3. Drilling in the loose formation, using percussive drilling machine water pressure step by step reaming construction technology.
4. Rotary core drilling is used to drill holes in bedrock aquifer.
5. In the process of drilling, the description should be made according to the technical requirements, and the layered soil samples, water samples and temperature measurement should be taken. The quality and quantity of sampling should be guaranteed.


There are seven points for attention in the construction process of drilling machine


1. The operators of water well drilling rig shall be trained and qualified and take up the post with certificate.
2. The equipment entering the site shall meet the construction requirements, and the trial operation test shall be conducted before the formal start-up of the well drilling rig, and the operation status shall be stated in time.
3. The specific drilling process should be prepared, the operation rules and standards of water well drilling equipment should be prepared, and the construction records should be made.
4. During the drilling process, it is not allowed to rotate until the planned elevation is reached. Maybe if the drill pipe needs to be rotated or raised under special circumstances, the drill pipe should be lifted to the surface, and the bit valve should be dredged and closed from the beginning. The operator should strictly control the descent speed and rotation speed of the threaded bit.
5. Before drilling, carefully check whether the air hole at the top of the core pipe is smooth, whether the concrete delivery hose joint is outstanding, and whether there is distorted appearance.
6. In the process of hole forming, when the drill pipe is found shaking or the footage is slow, the footage should be slowed down to avoid pile hole deflection, displacement and damage of drill pipe and drilling tool.

 

Rotary 100m ISO Water Well Drilling Rig Machine 0

Contact Details
Jinzhou City Shitan Machinery Equipment CO. LTD.

Contact Person: Anna

Tel: 15511892512

Send your inquiry directly to us
Jinzhou City Shitan Machinery Equipment CO. LTD.
Xiaoshang Village,Jinzhou City,Hebei province,China
Tel:86--15511892512
Mobile Site Privacy Policy | China Good Quality Water Well Drilling Rig Machine Supplier. © 2020 - 2024 drillingrigmachines.com. All Rights Reserved.